Past Performance

Hampton Restoration

Bruce Environmental Inc performed controlled cuts in asbestos-containing drywall using OSHA Class III tie back methods to allow HVAC register installation without rendering the material friable. Work was executed under regulated containment procedures to maintain material stability and protect adjacent areas. This targeted approach minimized disturbance, optimized overall abatement scope, reduced project cost, and shortened the project schedule while maintaining full regulatory compliance and safety standards.

  • Contract ID: Judi Barrett-340-TBK
  • Start Date: 11/13/25
  • End Date: 11/13/25
  • Value: $11,124.49
  • Contact Phone: Provided upon request

Hampton Restoration

Bruce Environmental Inc provided removal and disposal of approximately 191 square feet of asbestos-containing sheetrock ceiling materials and associated insulation within a basement kitchenette under regulated containment conditions. Services also included removal and disposal of approximately 191 square feet of asbestos-containing floor tile and mastic adhered to the slab in the same area. All work was completed in accordance with applicable federal and state asbestos regulations, with proper containment, waste handling, and site clearance procedures.

  • Contract ID: Lee Whitfield-841-ASB
  • Start Date: 02/16/26
  • End Date: 02/16/26
  • Value: $8,268
  • Contact Phone: Provided upon request

State Farm Insurance

Bruce Environmental Inc provided removal and disposal of approximately 799 square feet of asbestos-containing floor tile and black asbestos mastic adhered to a concrete slab across multiple basement rooms. Work included regulated containment setup, controlled removal methods to prevent fiber release, and proper packaging, transport, and disposal of asbestos waste in accordance with applicable requirements.

  • Contract ID: Fred Collier-836-ASB
  • Start Date: 01/01/26
  • Contact Phone: Provided upon request